Master Manufacturing and Batch Production Records Workflow

21 CFR Part 111 Subparts H and I  |  21 CFR 111.205, 111.255  |  Dietary Supplement CGMP
21 CFR 111.205  ·  111.210  ·  111.255
21 CFR 111.260  ·  111.123  ·  Part 111 Subpart P
A batch production record must follow the master
manufacturing record and capture every step
Phase 1 - Establish the Master Manufacturing Record
Phase 2 - Issue and Execute the Batch Record
Phase 3 - Yields, Packaging, and Deviations
Phase 4 - Quality Review, Release, and Retention
Decision point
GMPify Procedural Map Series
📝

Master Manufacturing and Batch Production Records - Documenting the Formula and Every Batch Made From It

Under 21 CFR Part 111, a manufacturer must prepare and follow a written master manufacturing record for each unique formulation and batch size, and must create a batch production record every time a batch is made. The batch record must match the master record and show that every production step was carried out. Quality control reviews the master record before use and the batch record before release. This map details the pathway from establishing the master record through batch execution, deviation handling, review, and retention.

21 CFR Part 111 Subparts H and I  ·  111.205  ·  111.210  ·  111.255  ·  111.260
21 CFR 111.205 to 111.210
21 CFR 111.255 to 111.260
Subpart P Records

Master Manufacturing Record

The written, approved formula and instructions for one formulation and batch size, followed for every batch.

Basis: Subpart H

Batch Production Record

The record of one specific batch, showing every master record step was carried out and who did it.

Basis: Subpart I

Contemporaneous Entries

Steps are recorded when they are performed, with the date and the initials of the people who did and verified the work.

Basis: At the time of the step

Quality Control Review

Quality control reviews and approves the master record before use and reviews the batch record before release.

Basis: 111.123
Phase 1
Establish the Master Manufacturing Record
1Define the formulation and batch size
Prepare a master manufacturing record for each unique formulation and each batch size, naming the supplement and the amount of each dietary ingredient per batch.
21 CFR 111.205; 111.210(a)
↓
2List components, weights, overages, and yields
Complete component list with weights or measures, any intentional overage, and the theoretical yield with the limits that trigger a deviation investigation.
21 CFR 111.210(b) to (f)
↓
3Write control point specifications and instructions
Specifications and instructions for each control point, sampling and test cross-references, two-person verification for manual operations, precautions, and corrective action plans.
21 CFR 111.210(h)
↓
4Describe packaging and attach a representative label
Packaging description and a representative label, or a cross-reference to where it is kept.
21 CFR 111.210(g)
Phase 2
Issue and Execute the Batch Record
Is the master record approved and current?
YES → Issue the batch record from it NO → Stop and obtain QC approval first
↓
5Issue the batch record from the approved master record
Batch production record created for each batch, with a unique batch, lot, or control number, matching the master record.
21 CFR 111.255; 111.260(a)
↓
6Record components and weights with verification
Identity and weight or measure of each component recorded, with one person weighing and a second verifying, and one adding and a second verifying.
21 CFR 111.260(d), (e), (j)
↓
7Record equipment, processing, and monitoring results
Equipment and lines used, cleaning and maintenance cross-references, in-process monitoring and test results recorded as they occur.
21 CFR 111.260(b), (c), (g), (h)
Phase 3
Yields, Packaging, and Deviations
8Compare actual yield with theoretical yield
Actual yield and percentage of theoretical yield recorded at appropriate phases, with an investigation if limits are exceeded.
21 CFR 111.210(f); 111.260(f)
↓
9Record packaging and labeling
Identifiers and quantities of packaging and labels, reconciliation where required, and a label or cross-reference.
21 CFR 111.260(k)
↓
10Document deviations, reviews, and reprocessing
Any material review and disposition decision, and any reprocessing, documented at the time it occurs.
21 CFR 111.260(m), (n)
Phase 4
Quality Review, Release, and Retention
11Quality control reviews the completed batch record
QC reviews the record, monitoring, and test results, and confirms the finished product meets its specifications.
21 CFR 111.260(i), (l); 111.123
↓
12Approve or reject the batch and any reprocessing
Documented QC decision on the batch, and on any repackaged, relabeled, or reprocessed product, before release.
21 CFR 111.260(l)
↓
13Retain records and revise the master record under control
Records retained under Subpart P, and the master record revised with QC approval when the formula, process, or a deviation trend requires it.
21 CFR 111.205; Subpart P
Record Types (Overview)

Master Manufacturing Record

One per unique formulation and batch size. Sets the specifications and controls that ensure batch-to-batch uniformity.

21 CFR 111.205 and 111.210

Batch Production Record

One per batch. Shows the master record was followed and every production step carried out.

21 CFR 111.255 and 111.260

Quality Control Records

Review and approval of the records, monitoring, test results, and disposition decisions.

21 CFR 111.123; 111.260(l)

Master Record Contents (Overview)

Formula and amounts Supplement name, each dietary ingredient with its strength or weight per batch, the component list, and weights or measures.
Overages and yields Any intentional overage, the theoretical yield, and the limits that trigger a batch deviation investigation.
Control point instructions Specifications, sampling, verification steps, special notations, and corrective action plans for each control point.
Packaging and labeling Packaging description and a representative label, or a cross-reference to where it is kept.

Key Outputs (Overview)

Approved master record Written, reviewed, and approved before any batch is made from it.
Complete batch record Every step, weight, verification, test, and yield recorded for that batch.
Deviation and disposition records Investigations, material review decisions, and reprocessing documented at the time.
Retained records Master and batch records kept and retrievable under Subpart P.

Record Quality Elements

Master Record Completeness Every item the regulation requires is in the master record, not left to operator knowledge.
Batch Record Fidelity The batch record mirrors the master record step for step, with nothing added or skipped.
Contemporaneous Entry Entries are made when the step is performed, never reconstructed later.
Two-Person Verification Manual weighing, measuring, and additions are verified by a second person who signs.
Yield Reconciliation Actual and theoretical yields compared, with defined limits that trigger investigation.
Deviation Traceability Every deviation links to an investigation, a disposition decision, and a corrective action.
Quality Control Gatekeeping QC approves the master record before use and the batch record before release.
Retention and Retrieval Records are retained, legible, and retrievable for the required period.

Never do this

Make a batch without an approved master record. Fill in the batch record after the fact from memory. Skip the second person verification on a manual addition. Release a batch before QC has reviewed the complete record and resolved every deviation.

Master record vs batch record

The master manufacturing record is the approved formula and instructions, written once for each formulation and batch size. The batch production record is created for each batch and documents that the master record was followed.

Contemporaneous means at the time

A step is recorded when it is performed, with the date and the initials of the person who did it and the person who verified it. Transcribing from scrap paper or completing the record at the end of a shift does not meet this expectation.

Key regulations

21 CFR 111.205 and 111.210 - master manufacturing record. 111.255 and 111.260 - batch production record. 111.123 - quality control of the manufacturing process. Subpart P - records and recordkeeping.